{"id":1038,"date":"2020-08-12T00:53:37","date_gmt":"2020-08-12T00:53:37","guid":{"rendered":"https:\/\/polarisepc.com\/?post_type=project&#038;p=1038"},"modified":"2020-08-12T00:53:45","modified_gmt":"2020-08-12T00:53:45","slug":"refinery-emergency-design","status":"publish","type":"project","link":"https:\/\/polarisepc.com\/index.php\/project\/refinery-emergency-design\/","title":{"rendered":"Refinery Emergency Design"},"content":{"rendered":"<p>[vc_section][vc_row][vc_column width=&#8221;3\/4&#8243;][vc_single_image source=&#8221;featured_image&#8221; img_size=&#8221;full&#8221;][vc_column_text]<strong>Engineering a Solution<\/strong><\/p>\n<p>A major Midwest refinery suffered a severe fire in the single crude unit that would render the crude unit out of service for nine months.\u00a0 The refinery called in Polaris Engineering to engineer a solution for running the plant without the crude unit.<\/p>\n<p><strong>Solid Design<\/strong><\/p>\n<p>Polaris Engineering evaluated the plant and provided a design to utilize existing equipment within the plant in completely new services to process crude.\u00a0 The design was completed in less than one week and passed through third-party HAZOP and Corporate review without any modifications.<\/p>\n<p><strong>Fast, Effective Results<\/strong><\/p>\n<p>The revamp cost $10MM and allowed the plant to operate at the designed reduced throughput for 6 months while the crude unit was repaired.[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/4&#8243;][vc_column_text]<i class=\"fa fa-clipboard\" aria-hidden=\"true\"><\/i> <strong>Scope of Work<\/strong><\/p>\n<p>Engineering<\/p>\n<p><i class=\"fa fa-calendar\" aria-hidden=\"true\"><\/i> <strong>Schedule<\/strong><\/p>\n<p>2001<\/p>\n<p><i class=\"fa fa-industry\" aria-hidden=\"true\"><\/i> <strong>Market<\/strong><\/p>\n<p>Refining<\/p>\n<p><i class=\"fa fa-map-marker\"><\/i> <strong>Location<\/strong><\/p>\n<p>Midwest[\/vc_column_text][\/vc_column][\/vc_row][\/vc_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_section][vc_row][vc_column width=&#8221;3\/4&#8243;][vc_single_image source=&#8221;featured_image&#8221; img_size=&#8221;full&#8221;][vc_column_text]Engineering a Solution A major Midwest refinery suffered a severe fire in the single crude unit that would render the crude unit out of service for nine months.\u00a0 The refinery called in Polaris Engineering to engineer a solution for running the plant without the crude unit. Solid Design Polaris Engineering evaluated the [&hellip;]<\/p>\n","protected":false},"featured_media":1039,"menu_order":2,"template":"","class_list":["post-1038","project","type-project","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/polarisepc.com\/index.php\/wp-json\/wp\/v2\/project\/1038","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/polarisepc.com\/index.php\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/polarisepc.com\/index.php\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/polarisepc.com\/index.php\/wp-json\/wp\/v2\/media\/1039"}],"wp:attachment":[{"href":"https:\/\/polarisepc.com\/index.php\/wp-json\/wp\/v2\/media?parent=1038"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}