{"id":1072,"date":"2020-09-02T02:56:01","date_gmt":"2020-09-02T02:56:01","guid":{"rendered":"https:\/\/polarisepc.com\/?post_type=project&#038;p=1072"},"modified":"2020-10-15T23:45:56","modified_gmt":"2020-10-15T23:45:56","slug":"gulf-coast-refinery-dock-installation","status":"publish","type":"project","link":"https:\/\/polarisepc.com\/index.php\/project\/gulf-coast-refinery-dock-installation\/","title":{"rendered":"Gulf Coast Refinery Dock Installation"},"content":{"rendered":"<p>[vc_section][vc_row][vc_column width=&#8221;3\/4&#8243;][vc_single_image source=&#8221;featured_image&#8221; img_size=&#8221;large&#8221;][vc_column_text]<strong>Design Coordination<\/strong><\/p>\n<p>Polaris Piping Design coordinated with the third-party Construction team to design a modular pipe rack setup that could be fabricated remotely, loaded with pipe, and set on a barge for delivery to the Gulf Coast site.\u00a0 Special efforts in stress analysis were required to provide loads to Civil\/Structural and an optimal design\u2014both constructible and economical.<\/p>\n<p><strong>\u00a0<\/strong>Our engineering team worked efficiently and creatively to determine the required data to allow the dock engineering contractor to proceed with construction early.\u00a0 The project is still in construction, but much of the Polaris Engineering scope has successfully been delivered.[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/4&#8243;][vc_column_text]<i class=\"fa fa-clipboard\" aria-hidden=\"true\"><\/i> <strong>Scope of Work<\/strong><\/p>\n<p>Mechanical &amp; Piping<\/p>\n<p><i class=\"fa fa-calendar\" aria-hidden=\"true\"><\/i> <strong>Schedule<\/strong><\/p>\n<p>March 2019 \u2013 June 2020<\/p>\n<p><i class=\"fa fa-industry\" aria-hidden=\"true\"><\/i> <strong>Market<\/strong><\/p>\n<p>Refining, Oil &amp; Gas<\/p>\n<p><i class=\"fa fa-map-marker\" aria-hidden=\"true\"><\/i> <strong>Location<\/strong><\/p>\n<p>Southeast, Texas[\/vc_column_text][\/vc_column][\/vc_row][\/vc_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_section][vc_row][vc_column width=&#8221;3\/4&#8243;][vc_single_image source=&#8221;featured_image&#8221; img_size=&#8221;large&#8221;][vc_column_text]Design Coordination Polaris Piping Design coordinated with the third-party Construction team to design a modular pipe rack setup that could be fabricated remotely, loaded with pipe, and set on a barge for delivery to the Gulf Coast site.\u00a0 Special efforts in stress analysis were required to provide loads to Civil\/Structural and an [&hellip;]<\/p>\n","protected":false},"featured_media":0,"menu_order":2,"template":"","class_list":["post-1072","project","type-project","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/polarisepc.com\/index.php\/wp-json\/wp\/v2\/project\/1072","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/polarisepc.com\/index.php\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/polarisepc.com\/index.php\/wp-json\/wp\/v2\/types\/project"}],"wp:attachment":[{"href":"https:\/\/polarisepc.com\/index.php\/wp-json\/wp\/v2\/media?parent=1072"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}