Polaris executed a design-build 7 MW CHP Power Plant for the University of the West Indies.  The project consisted of 5 1.4 MW reciprocating engine generators combined with exhaust driven chillers for campus cooling.

  • 7 MW of Power Output
  • LNG Fueled
  • LPG Backup Fuel
  • 24kV grid tied switchgear
  • Combined Heat and Power Integration w/ existing Campus utilities

Scope of Work

Startup / Commissioning

Schedule

January 2018 – March 2019

Market

Power

Location

Caribbean